KONTAKT

Harjase OÜ
Ermistu küla, Tõstamaa vald, 99105 Pärnumaa
Registrikood: 11061766
KMKR: EE100933491
E-mail: info@harjase.ee
Tel: +372 503 5499

FIRMAST

Harjase OÜ on Eesti kapitalil põhinev ettevõte, mis asutati 2004. aastal. Oleme saavutanud jõudsa ja stabiilse arengu tänu meie heade koostööpartnerite usaldusele ning edukale koostööle. Harjase - siia kuuluvad mehed, kes omavad tehnilisi teadmisi ja oskavad teha tulemuslikult tööd.

EXTRACT FROM WORKS PERFORMED

– Excavation works for the district heating and hot water pipeline at Pärnu children’s home (June 2010)

– Construction of snowmaking system (October 2009)

– Excavation works for the installation of culverts during the reconstruction of Pärnu-Rakvere road, cleaning ditches (August 2009)

– Heat pipeline route in Välja street for the new Volkswagen center (July 2009)

– Heat pipeline route behind Port Artur 2 (June 2009)

– Heat pipeline route for Jannseni street (May 2009)

– District heating route parts I and II for Põhja street (January – March 2009)

– Construction of snowmaking system, construction of snow storage and production field, construction of roads (October – November 2008)

– The foundation base and draining ditch for the new house of Tolli farm in Kihnu (August 2008)

– Installation of waffle coating at the end of taxiway and runway of Kihnu airport (May 2008)

– Digging a pond, designing the slopes, and cleaning ditches (February – March 2008)

– Installation of waffle coating for Ruhnu airport and cleaning the safety area (June – July 2008)

– Construction of snowmaking system (October – December 2008)

– Excavation works of drainage system and the installation of waffle coating for Kihnu airport (September – October 2007)

– Crushing gravel in the Alu quarry, and cleaning the edges of the quarry (August – September 2007)

– Excavation and filling works of the district heating route at Jalaka st 10 (July 2007)

– Construction of the domestic hot water route and relocation of sewer route in Ehitajate tee (June 2007)

– Extension of Ehitajate tee at Tõstamaa (May – October 2007)

– Excavation works for district heating route and soil restoration works for Kilingi-Nõmme Gymnasium (May 2007)

– Ranna pst. 9 – excavation works of district heating system route and soil restoration (April – May 2007)